We were fully plumbed and wired as of July 23, now just waiting for inspections so we can get the drywall up to get a real feel for the spaces inside. We got our huge shower with a daylight window above, the pipes running downstairs to the water heater are in the second picture, our kitchen begins to happen with outlets and wires everywhere (third picture), and remind me to never attempt hanging anything on the wall in the last picture!
0 comments:
Post a Comment