11.04.2009

BlueCross Centre - field trip!

Okay, my turn to talk about work. This is the new headquarters for BlueCross BlueShield under construction here in Omaha. I worked on this project for just over a year and a half, and I'm super excited to see it taking shape! I served as the CAD coordinator (working between two different software platforms, AutoCAD and Revit), helped with LEED documentation (a green building rating system), and a few design decisions along the way. It will be 10 stories tall plus a penthouse mechanical floor with open office areas, a workout facility, conference rooms, cafeteria and kitchen, training rooms, and supporting mechanical areas. We had a "field trip" with the architectural staff that worked on the project last week. I've attached a few of the pictures below. Also check out www.tetradcorp.com. That's the building owner's website - they have a live camera update from the top of the Travel and Transport building as well as a couple renderings of the design.

Our Leo A Daly sign with Kiewit (the contractor).
The precast concrete installed in this picture covers the loading dock and mechanical areas on level 1.

This is from the loading dock looking up at 10 stories of steel. The orange fence is temporary fall protection. We were only able to go up to level 6 because the fence hadn't been installed on the upper levels.

This is the first section of curtainwall to be installed. It's a large cantilevered area that holds the exercise facility and aerobic studio. It overlooks the Keystone bike trail and the Papio Creek.

This is taken from level 6 of the building looking down at the sitework for the parking garage. The large drill and crane in the back are for the auger-cast piles. See how little the people are? Crazy.

This is also the first project I've worked on where I got to sign the beam. Sounds dorky, but I'm pretty stoked about it. Basically, anyone who worked on the project can sign the beam and it's put in at the top level. It's not structural, and remains uncovered. I made my mark on architecture! Literally!

10.19.2009

New House: Move Day!

As of last night... WE'RE IN! My dad and I switched vehicles (I now drive a huge F-150 for a few days), and Grant and I were able to move all the big stuff yesterday. Our only exceptions are the washer and dryer, our dining room table, and hutch. For some reason, I believe Grant doubts my brut strength! The first picture shows a filled third stall of our garage. Grant likes the second picture - imagine that. We ended up finding a great deal at the NFMart on a flatscreen TV for the living room that we couldn't pass up. (The seating/viewing area in the room is pretty shallow, and his 52" TV was too big.) Needless to say, when they're sitting together, the creative juices start flowing for a wall of TVs to watch multiple football games, etc. Yeah, not gonna happen. :) There's a picture of our finished, and already cluttered kitchen, and our fridge. Yogurt (for my breakfast this morning), champagne (for our first night in the new house), Burning Skye Ale (good beer to go with wings), and ketchup (for the potato wedges). And our first meal... drumroll please... Wings and wedges 'to go' from Buffalo Wild Wings. I know, so fancy!

Long story short - we grabbed enough stuff for one night, one shower, a set of sheets, one set of dress clothes for work, one meal for Mia, and SPENT THE FIRST NIGHT IN OUR NEW HOUSE!!!









10.09.2009

New House: Carpet

Really really really close now! When we came in last night, we had fresh carpet, a garage door opener, towel bars and toilet paper holders, hot water, and heat! We also grouted the backsplash last night and it was great to have warm water to wash your hands in instead of a hose outside! The final plumbing and mechanical inspections were completed yesterday, so now Grant will be able to install the sprinkler system over the next week or so. The other vanity light came in, along with the fans, so they'll be installed today. The last picture is hard to see, but we're pretty excited about the recessed cans on the exterior instead of wall hung exteior fixtures. It just adds a clean look. Only a few weeks now......




10.06.2009

New House: Lights, Appliances, & a Backsplash... oh my!

So, a lot can happen in one day! Yesterday, our lights were delivered and installed - we're only missing one vanity light and the ceiling fans for the living room and bedrooms. We have a mixture of can lights and hanging pieces in the main area (kitchen/dining/living/entry). As you can tell, we also got our appliances - only the refridgerator is installed in the pictures because we spent all night tiling the backsplash that FINALLY came in. We literally waited almost five weeks for it. But the range, microwave, and diswasher were all there, just sitting in the living room while we tiled. Padraic Stack (BCDM co-worker of Grant's, former roommate, best man in our wedding) came along to help last night, and he and Grant finished laying the backsplash. Grant and I will be grouting and getting things cleaned up on Thursday night hopefully. I also included a picture of our fancy kitchen faucet. A little industrial, but the finish matches the appliances exactly, and I think the hook is really fun. The last picture is of the master bathroom. All the casework is finished, facuet mounted, mirror and vanity light hung. As of now, we'll be getting carpet Wednesday or Thursday along with the ceiling fans, remaining vanity light, and garage door openers. Getting really close now...

p.s. This is how much I enjoy having finished plumbing - I didn't have to drive back to our rental house to go to the bathroom while we were working! I guess it's the little things in life. :)

10.02.2009

Outside the life of the new house_A little bit of Grant's work



Exterior model images of Holy Spirit I and Holy Spirit II, Bowling Green, KY

Spirit I - (left side upper image) Classrooms, Social Hall, Offices, currently under construction with a completion date at the end of November.

Spirit II - (right side upper image) Main Sanctuary, and Narthex under construction with a completion date of November 2010

Holy Spirit Catholic Churh

A rendering of the Revit model I created to show the glass canopy, an abstract symbol of the Holy Spirit descending upon the baptismal font

The north sanctuary wall - Glass artwork representing tongues of fire

Then there appeared to them tongues as of fire, which parted and came to rest on each one of them. And they were filled with the Holy Spirit. Acts 2:3,4

Baptismal Font - located under the baptismal font glass canopy


Reconciliation - Ambry and one of the stations of the cross

9.21.2009

New House: Tile (volume 2)

Still no finished-finish pictures, but we're getting closer. Grouting takes SO much longer than I ever expected. The blue painter's tape will stay up until we're done cleaning the tile/grout. If anyone has spoken with Grant's dad, Greg, he'd probably verify how he wanted to strangle me when I let him know that Grant and I had designed a 6x12 border and a 45-degree brick pattern for the dining room and kitchen (aligning with the island). And then a coordinating diagonal 6x12 border for the entryway. Also, if you know Grant and me, we can't do things the easy way - don't be ridiculous!

Now that all the grout is in and has been cleaned at least a couple times, they'll be setting the toilets and installing finish plumbing fixtures this week. Also, we picked out carpet called "River Rock" on Sunday, and we've made our first attempt at the lighting fixutres. Hopefully, by later this week, we'll have finished all of our big decisions, and just watch the last few pieces come together.





9.17.2009

New House: Outdoor Stairs, HVAC, Sinks

A few smaller things have been finished at the house over the past week. They put in stairs out the sliding glass door in the dining room. (We'll be designing and building a deck - with the help of my dad - probably next spring/summer. For now, we have a set of stairs going to a concrete landing directly out our door so we can get out to grill, etc.) They installed our two vanity sinks in the bathrooms. Both are a dark "Canyon" polystone. Basically, polystone means that they're a hard plastic composite with a bunch of color flecks throughout it - they turned out awesome. They also installed the large mirrors above each vanity last week. Although not as fun to look at, they also installed our furnace and hooked up all the ductwork. Pretty sweet lookin, huh?

Other than this, we've just been grouting and cleaning the tile the past week, looking at lighting possibilities, and picking out carpet. It stinks that quite a few of these places and people we have to talk to are only open during business hours and limited time on Saturdays. So, hopefully we'll be able to knock out a couple appointments on Saturday morning and get some more decisions made!



9.07.2009

New House: Tile (volume 1)

Our Labor Day was anything but a break! The Monday off work gave us some extra time to get the tile laid throughout the house. Luckily, Grant's dad, Greg, came down for the long weekend to help us. Also, Josh Ropski, a friend from work already owned a tile saw that we could borrow, so that saved us mega rental bucks! We started in the master bathroom (first and second picture) on Friday. Once we got a system figured out, we did the other bathroom and the entryway on Saturday and took the night off to watch Husker football - of course! On Sunday, we finished the Dining Room area (the last three pictures), and Monday gave us just enough time to complete the rest of the kitchen. Those diagonal cuts took quite a bit of time, but it turned out great and looks awesome! We still have the mud room to finish, but it's completely square, so it should move pretty quickly. We still have to grout all the areas as well. I now fully understand why tile sub-contractors charge so much for labor. Granted, we're probably not quite as efficient, but geez this stuff takes forever! More to come...





New House: Exterior Paint

On Saturday, our house was officially painted! The painter (in the first picture) usually paints on a crew for his dad's company, but works on his own for a house this size, and was completely done in less than a day. He taped off all the windows and doors, sprayed on the base house color "Dormer Brown" and then went back over the trim with a custom color match to the brown window trim. The second picture is a finished product. Now I'm getting antsy to get some grass and landscaping designed for our front yard to break up all the brown tones we have going on.

9.04.2009

New House: Laminate & Paint

Over the last two days, the interior has changed quite a bit. You'll notice our "Nomadic Desert" interior paint, our "Rustic Slate" counter laminate, and granite composite sink. After looking at itty bitty samples of laminate counter options, we were really excited to see it installed - you can kinda get a picture of what it looks like in the close up picture. The wall is still unpainted under the cabinets because we're going to be doing a 2"x2" tile mosaic backsplash that matches the floor tile. You can see the island taking shape with the addition of the sink and kickplate along the dining/living room side. We were also pleasantly surprised that the front door, which Grant and Padraic are checking out in the last picture, is "wood." (It's actually a gel-coat on a fiberglass door that looks very similar to wood stain, while the door still has the necessary safety.) We were going back and forth on what color we wanted to paint the front door, so this made our lives a lot easier! :)

While no specific pictures are posted of this, they also have painted and hung all of our interior doors, put shelves in all of the closets, and also painted the garage. The outside will be painted soon - as long as the rain holds off for a period of time!

P.S. We're going to be laying tile this weekend, so Tuesday's post will either be really awesome, or at least have some good stories from the weekend's attempts. :)